Clean Water Marina

« «     » »

The Port of Bellingham sought our services when they were faced with the daunting task of rehabilitating a former industrial waste water lagoon (Aeriated Stabilization Basin) into a LEED, sustainable Marina for recreational boating.      We hosted a one day charrette with participants from state and local public agencies, consultants and Port of Bellingham Staff.

Proposed Marina Design

 

GP Lagoon before redesign




Fatal error: Uncaught Exception: 12: REST API is deprecated for versions v2.1 and higher (12) thrown in /home/crisptab/public_html/masterplanning.com/wp-content/themes/thetheme/class/thirdparty/fb-api/base_facebook.php on line 1130